Wedge -
- Only ceiling will have barn board.
- Removed faux beams.
- No stone around fireplace. Could be tile or steel. Look at etched steel. See LL
- Confirmed roll screens at patio doors.
- Confirmed open shelving at upper wall cabinets.
- No dishwasher in wedge kitchen.
General -
- Simpler doors. Maybe beadboard single panel.
- Peter suggested knotty white pine with satin finish. S&M not sure. See LL.
- Reduced Bunk Rm #2 to 2 bunks.
- Added flow through from Shoe kitchen to bunk rooms.
First Floor Kitchen -
- Added window at south end
- Relocated sink base to below new window on south side.
- Wood counter top, inside and out at pocket window. Window track to be flush with counter surface.
- Make pocket window clear span with no center divider.
- Make pocket window higher end product i.e. Dynamic.
Exterior -
- Added large wood piers
- Changed roof over Master Bedroom deck
- Removed all brackets.
- Will look at adding some decorative collar ties over MBR deck
Topics for next meeting
- Lighting
- Sonos speaker location
- Gas line locations
- Garage electrical
- Basement layout
- Basement finish - R & P?
- Patio material
- Finalize kitchen
- Ceiling treatments
- Stair treads
- HVAC
- Wood storage
- Confirm all countertops
- Discuss Bunk Rm #2 again.
- Wood ceiling in Wedge first floor?
- Set up meeting with LL - for colors and lighting and flooring
- Set up meeting with Cabinet Shop - to look at styles
- Wood stove venting - through roof or out side and up
- Door hardware
- Cabinet Hardware
- Window treatments