Meeting Notes 6/15/12

Attendees: Sam Burman, Mitchell Burman, Peter Stames


Wedge -
  1. Only ceiling will have barn board.
  2. Removed faux beams.
  3. No stone around fireplace.  Could be tile or steel.  Look at etched steel.  See LL
  4. Confirmed roll screens at patio doors.
  5. Confirmed open shelving at upper wall cabinets.
  6. No dishwasher in wedge kitchen.
General - 
  1. Simpler doors.  Maybe beadboard single panel. 
  2. Peter suggested knotty white pine with satin finish.  S&M not sure.  See LL.
  3. Reduced Bunk Rm #2 to 2 bunks.
  4. Added flow through from Shoe kitchen to bunk rooms.

First Floor Kitchen - 
  1. Added window at south end
  2. Relocated sink base to below new window on south side.
  3. Wood counter top, inside and out at pocket window.  Window track to be flush with counter surface.
  4. Make pocket window clear span with no center divider.
  5. Make pocket window higher end product i.e. Dynamic.
Exterior - 
  1. Added large wood piers
  2. Changed roof over Master Bedroom deck
  3. Removed all brackets.
  4. Will look at adding some decorative collar ties over MBR deck



Topics for next meeting
  • Lighting
  • Sonos speaker location
  • Gas line locations
  • Garage electrical
  • Basement layout
  • Basement finish - R & P?
  • Patio material
  • Finalize kitchen
  • Ceiling treatments
  • Stair treads
  • HVAC
  • Wood storage
  • Confirm all countertops
  • Discuss Bunk Rm #2 again.
  • Wood ceiling in Wedge first floor?
  • Set up meeting with LL - for colors and lighting and flooring
  • Set up meeting with Cabinet Shop - to look at styles
  • Wood stove venting - through roof or out side and up
  • Door hardware
  • Cabinet Hardware
  • Window treatments